Why should we believe what you say in your consultation document?

At NATS and Gatwick Airport Limited we take our responsibilities very seriously and whenever we present proposed changes we always seek to present the best available information.

Furthermore, the process for airspace change is regulated by the CAA.  As part of this change process we will be required to analyse performance after one year and demonstrate that the change is working as anticipated.  If the CAA determines this not to be the case then they may require us to make further changes to rectify the situation which would be costly and time consuming.

It is in nobody’s interest to have incorrect information in the consultation material.

Posted in: a) General